Get Offer
Product Categories

About Us

For over 20 years, we have served in various technical management roles within Aydem Renewable Energy Inc., which holds one of Turkey's largest renewable energy production portfolios.

During our tenure:

Investment Phase:

We managed the hydromechanical and electromechanical design, manufacturing, and installation processes for 9 hydroelectric power plants. These plants include 4 Pelton, 4 Kaplan, and 13 Francis type units, with a total installed capacity of 680 MWh.

We conducted turbine procurement, project development, permitting, construction, and electrical works for 3 wind power plants. In these plants, we commissioned 111 wind turbines of various brands and models, with a total installed capacity of 238.5 MWh.

We oversaw the procurement, installation, and commissioning processes for solar power plants with a total installed capacity of 82.15 MWh.

Maintenance Phase:
We carried out testing and maintenance processes for the mechanical, electrical, and control systems of 20 hydroelectric power plants, as well as the electrical maintenance and testing processes of 3 wind power plants and 1 solar power plant. The total installed capacity for which maintenance planning was carried out is approximately 1180 MWh.

Drawing on the knowledge and experience we have gained in the fields of HPP, SPP, and WPP processes, along with strong bilateral relationships with well-established suppliers in Turkey, Europe, and China, we founded ENERMEKS to reflect all our expertise into the sector.